Full Title
Research and Product Integration - Design, Development and the Integration Blueprint
Contact Person
Darren Baldwin
Project Team
Project Leader: Robert Argent (University of Melbourne)
Funding Body
eWater CRC
Duration
1 January 2006 to 28 February 2009
Outcomes
An annual Integration Blueprint meeting will be held.
Summary
This project will design and develop integration processes and produce the Integration Blueprint.
Darren Baldwin has time commitments to two of the six milestones.
Milestone 5 - Annual Blueprint, product assessment and look-forward matrix (Duration: 1 March 2007 to 28 February 2009)
Milestone 6 - Development of a common conceptual approach (Duration: 1 January 2006 to 28 February 2007). This task will lead development of a conceptual approach to various eWater projects (listed below) contributing research on water, constituent and other fluxes to products.
- B1 Multiple drivers of river ecosystems
- D2 Enhanced forecasting of catchment stream-flow
- D3 The estimation and prediction of the exchange between groundwater and surface water in lowland rivers
- F1 Impacts of constituents on in-stream processes and food webs
- F2 Flow regime, water quality and biological interactions between rivers and floodplains
- F3 Flow, biogeochemistry and productivity of Australian Estuaries.